Business building, 2020.

GAK business center, complete assembly of the glass facade on the lower part and ALU windows with protective fixed blinds on the upper part of the building. A sliding entrance door was also installed as an entrance to the shopping center, as well as a door with a panic function and a "close as soon as possible" function.

Scroll to Top