Skelin Mont have numerous successfully realized projects!
Luxury tourist project, Maslina Resort, Hvar – 2021.
Luxury catering facility, Šibenik 2022.
Installation of a complete Schüco sliding system (ASS) with associated substructure and glass with decorative strips. In addition to the large 6-leaf shutter, the building also has a 3-leaf shutter and SCHÜCO windows with the same decorative slats.
Business building, 2020.
GAK business center, complete assembly of the glass facade on the lower part and ALU windows with protective fixed blinds on the upper part of the building. A sliding entrance door was also installed as an entrance to the shopping center, as well as a door with a panic function and a "close as soon as possible" function.
Luxury private building, Sukošan 2022.
Installation of high-quality ALU Schuco carpentry / sliding glass walls throughout the building.
Telaščica Nature Park, 2022.
Installation of large glass surfaces and carpentry on a building where mechanized access is difficult.
Firule Hospital, Split 2019.
PVC carpentry, replacement of all carpentry in the hospital building in difficult conditions during normal operation of the hospital complex.
Business building, 2020.
Manufacture and installation of a glass facade on a commercial building.
Residential and commercial building, 2022. Germany
Installation of ALU Schüco joinery throughout the building.
Luxury private building, 2021.
Installation of ALU Schüco joinery, large glass walls.
Luxury tourist project, Maslina Resort, Hvar – 2021.
Business building, 2020.
GAK business center, complete assembly of the glass facade on the lower part and ALU windows with protective fixed blinds on the upper part of the building. A sliding entrance door was also installed as an entrance to the shopping center, as well as a door with a panic function and a "close as soon as possible" function.